This bathroom began with tiny pink tile, holes in the floor, leaks and mold. We replaced all the drywall, insulation, flooring, plumbing, drains, and HVAC. This bathroom now features heated floors; heated, curbless shower with a body spray system and rainhead showerhead, and a niche for storage; a soaking tub; a heated towel bar; a toilet with a heated seat and bidet; a floating concrete sink; a ceiling-mounted bluetooth speaker; and a pocket door.

Next
Next

Master bathroom